Published date: 26 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Water desalination services - 65122000
East of England
£40,000,000 to £50,000,000
C4N85577919
26 September 2024
8 November 2024
5pm
29 November 2024
30 January 2026
Works
Yes
No
1. Sizewell C needs a sea water reverse osmosis desalination plant during the construction and initial production phase of the Sizewell C nuclear facility in Suffolk.
2. IDE Technologies and DC Dwek Corporate Finance partnered for the desalination project. IDE is one of the leading desalination and water treatment companies in the world and has a strong
international track record of desalination plant delivery.
3. The maximum capacity of drinking water required is 5,000 m3 per day with a maximum intake of 13,300 m3/day for a 15-year period. The plant needs to be constructed to a 25-year life.
4. All the desalination equipment will be supplied from Europe and assembled onsite. 1st and 2nd pass membrane skids with all the key desalination equipment will include:
a. Extensive pumping requirements and redundancy including high pressure pumps, dosing pumps, backwash pumps, limestone feed pumps, potable water and transfer pumps.
b. Pressure vessels and reverse osmosis membranes.
c Detailed pre and post treatment requirements including de-gritting, flocculation, dual membrane filters, limestone etc.
5. We will require UK based Civil and Mechanical & Electrical contractors to prepare the site and to connect the skids to the electric control rooms and to the necessary pipework.
6. All the post RO membrane water related equipment supplies need to comply with Drinking Water Inspectorate (DWI) UK water regulation 31. This includes:
a Piping
b Tanks
c. Valves
7. All electrical works will be required to UK standards. The two containerised electric rooms will need to be supplied to interconnect with the skids and control the plant. The MEICA contractor will
interconnect as required.
8. The infrastructure is critical for Sizewell and there is a 16-month timeline for the project with plant availability expected from October 2025 and project completion by January 2026.
9. We are committed to offering the opportunity to local contractors and suppliers to meet the Sizewell C local content and social value goals of the wider project. Support is offered to local suppliers by
The Suffolk Chamber of Commerce.
10. Interested parties are to register on the CompeteFor platform. https://www.competefor.com/sizewellc/ ). There is a summary of the requirements for each activity and a full package of information
(including equipment requirements complying with DWI 31) available following the signing of an NDA.
11. Due to the short time scales, pricing responses will be required during October 2024. See summaries for details.
12. Further information available directly from David Dwek (david@dcdwek.com), Gabi Verberne (gabiv@ide-tech.com) and Hanna Yael Gabay (HannaG@ide-tech.com).
Links
Additional text
See attachments
Follow the instructions given in the description or the more information section.
David Dwek
162-168 Regent St
London
W1B5TB
UK
02072877841
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
จัดซื้อและติดตั้งซอฟต์แวร์ DaVinci Resolve Studio จำนวน 17 License下一篇:
จ้างโครงการปรับปรุงอุทยานเฉลิมพระเกียรติ พื้นที่เขตดุสิต โดยวิธีเฉพาะเจาะจง猜你喜欢