Published date: 26 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction work - 45000000
England
£0 to £2,200,000
GLOSCC001-DN742589-79793080
26 September 2024
31 October 2024
12pm
6 January 2025
30 May 2025
Works
Other
Yes
No
This advert is intended to notify potential suppliers of the combined tender including both the Rushmire Hill Geotechnical remediation and the Standish Multi-User Path works. These two pieces of work have been packaged as a single tender.
Rushmire Hill Geotechnical Remediation
Rushmire Hill is in South Gloucestershire, near Wotton-under-Edge, approximately 1.2 km south of Cotswold Edge Golf Course. The works are required to stabilise the B4058 carriageway, which has historically suffered deterioration from ground movement. Remediation works will include sheet piling along the GCC owned verge, verge and carriageway reconstruction. Site clearance will also be required to facilitate the piling works.
Summary of Construction Phase key deliverables are as follows:
Site clearance including tree clearance over approx. 255m, 3.5m width.
Sheet piling installation along an approx. 255m length of verge.
Partial carriageway reconstruction of the northbound carriageway over 280m.
Carriageway resurfacing over approx. 300m
Ground investigation including the installation of 3 no. inclinometers and 1 no. slotted standpipe in the carriageway
Traffic Management during the construction works.
Maintain residents' access during the construction works.
Standish Multi User Path
The works are located between the Horsemarling Lane roundabout and Blackbridge access track to the south of Standish, Gloucestershire. This scheme is part of a wider strategic scheme to boost active travel provision within the county, through the creation of the Gloucestershire Cycle Spine and includes a section of bridle way.
Summary of Construction Phase key deliverables are as follows:
Construction of 400m of 3m wide new shared use path and bridal way
150m of carriageway realignment and works to splinter island
Streetlighting column installation and relocation. Columns will be supplied by GCC.
Utility diversion works (pre-arranged by GCC for Principal Contractor to liaise/accommodate).
Drainage works that tie-in to existing systems and includes ditch and attenuation pond construction.
Traffic Management during the construction works.
Maintain residents' access during the construction works
Gloucestershire County Council are seeking a Principal Contractor to deliver the construction phase of this project.
A summary of the outline programme for the combined packages of works is shown below:
Tender period: 26th Sep - 31st Oct 2024
Award: Monday 25th November 2024
Anticipated Works Start Date: Monday 6th January 2025
Completion: Friday 30th May 2025
Overall Duration: 22 weeks
Indicative Value: (£2.2M + £0.44M VAT) = £2.64M
The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.
Full details will be available in the tender pack advertised on Procontract Thursday 26th September 2024.
https://procontract.due-north.com/Advert?advertId=e79b7d6e-ad6f-ef11-812f-005056b64
Follow the instructions given in the description or the more information section.
Mike McGowan
Shire Hall
Gloucester
GL1 2TH
England
+44 1452328900
mike.mcgowan@gloucestershire.gov.uk
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
WP4022 - Digital Smoking Cessation下一篇:
จ้างจัดกิจกรรมเสริมพลังเครือข่ายนักวิชาการ จำนวน ๑ งาน โดยวิธีเฉพาะเจาะจง猜你喜欢