所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 9 September 2024
Last edited date: 24 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Waste incinerators - 42320000
Other miscellaneous construction materials - 44192000
Construction work - 45000000
Installation services of waste incinerators - 51135110
Consultative engineering and construction services - 71310000
Engineering design services - 71320000
GU24 0NF
£405,000 to £450,000
BC22-004
9 September 2024
11 October 2024
12pm
18 November 2024
31 December 2025
Service contract
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers.
The scope of works will involve:
• Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation.
• Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops.
• Deconstruction of existing refractory lining and Anchors (Disposal of waste by others)
• Installation of the new anchors and refractory lining as per agreed detailed design.
• Management of drying out and curing of the lining.
• Management of all subcontractors employed by the supplier to complete these works.
• Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document.
Attachments
Additional text
Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (Appendix E1 - Site Documents, Appendix E2 - Incinerator Dimensions and Appendix E3 - Front Plate Technical Datasheets) be granted to the requester.
Follow the instructions given in the description or the more information section.
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Cambridgeshire County Council SME Webinar Event: Introduction to Procontract Where to Find Public Sector Opportunities下一篇:
24 ก.ย. 2567 | วิทยาเขตหาดใหญ่ #จัดซื้อ-จัดจ้าง猜你喜欢