所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 4 July 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Architectural, construction, engineering and inspection services - 71000000
Channel Islands
£0
POJ001-DN731292-34212149
4 July 2024
22 July 2024
10am
30 July 2024
30 April 2026
Service contract
Other
Yes
No
Ports of Jersey ('PoJ') is currently underway with the development of an Airport Masterplan. This Masterplan includes modernising and optimising the Departures Lounge ('DL') to meet current and future passenger needs in line with our strategic business plans. To support the DL redevelopment, a concept design has been developed for the ground floor of the terminal building.
The level of design which has been undertaken is equivalent to Royal Institute of British Architects ('RIBA') Stage 2 ('Concept Design') which sets out the architectural concept of the DL to align with operational requirements as well as supporting the passenger journey through the airport.
PoJ are looking to appoint a 'Design Team Lead' who will take this existing concept design and develop through to RIBA 7 (handover).
Follow the instructions given in the description or the more information section.
Procurement Department
Jersey Airport
St Peter
JE1 1BY
United Kingdom
+44 1534446094
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢