所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 13 May 2024
Last edited date: 13 May 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction work - 45000000
Forestry services - 77200000
PL10 1LA
£55,000 to £70,000
SPF_Track_Upgrade
13 May 2024
10 June 2024
5pm
15 July 2024
1 September 2024
Works
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Pigshill and Clarrick Woods CIC was formed in 2013 to manage 66-acres of woodland under a long lease.
Our key objectives are:
1. Protect and enhance the woods' ecosystem
2. Create employment and training opportunities for local people
3. Improvements in well-being for locals and visitors
4. Encourage education about the area's natural environment
There are a range of habitats and a mix of historical silvicultural systems across the woodlands; including areas of scrub, coppice, single-species stands and mixed-broadleaved woodland
Pigshill and Clarrick Woods has been awarded funding by the UK Shared Prosperity Fund CIoS Good Growth Community Levelling Up for infrastructure, equipment and vehicle upgrading.
Pigshill and Clarrick Woods CIC is seeking tenders from qualified contractors to upgrade the tracks in our woodland located on the Rame Peninsula SE Cornwall near the villages of Millbrook and Cawsand. This project aims to improve the woodland for the benefit of the local community.
Our group needs to upgrade 1300m of forest tracks.
Tender requirements
Tenderers must:
• Have demonstrable experience in woodland management and improvement projects.
• Possess relevant qualifications and certifications for the proposed works (e.g., forestry qualifications, health and safety certifications etc).
• Provide a detailed project plan outlining methodology, drawings timeline, and resources.
• Submit a competitive quote for the project, including a breakdown of costs.
• Demonstrate a commitment to working with the local community throughout the project.
Scope of work
To scrape and prepare forestry tracks to a distance of 1300 meters long x 2.25-2.6 meters wide.
All unwanted excavated material to be placed and spread on designated areas on the sides of the track.
To create a grip at the side of the bank.
To excavate and install culvert pipes and back fill approx 16 linear meters where necessary and/or implement necessary drainage solutions to mitigate erosion and waterlogging.
To supply and deliver crushed run hard core to two access areas near the entrance of both sites. Material to be re - loaded on to narrow access low ground pressure dumpers and hauled to an excavator for spreading.
All hard core to be spread at a depth of 100mm to 200mm in softer areas and compacted.
The contractor will provide all the relevant site signage, health and safety and site rams.
The contractor will communicate with all the relevant authorities and will seek and obtain all the necessary permits and licences to deliver the work.
Tender clarifications
Any clarification queries arising from this Invitation to Tender which may have a bearing on the offer should be raised by email to:
daniel@pigshillandclarrickwoods.org.uk
Attachments
Follow the instructions given in the description or the more information section.
Daniel Alvarez
Fore Street
Kingsand
PL10 1NA
England
07791536449
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Framework for the supply of Accident and Repair Services下一篇:
Leasing, Installation, Dismantling and Storage of Christmas Illuminations in Kirklees猜你喜欢