Published date: 5 July 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Additives for cements, mortars or concretes - 24957200
Concrete pumps - 42122190
Concrete or mortar mixers - 43413000
Concrete - 44114000
Ready-mixed concrete - 44114100
Concrete products - 44114200
Concrete slabs - 44114250
Reinforced-concrete structures - 45223500
Concrete work - 45262300
Reinforced-concrete work - 45262310
Concrete carcassing work - 45262311
Unreinforced-concrete work - 45262350
Concrete-coating work - 45262370
North West
£250,000 to £500,000
C4N82188495
5 July 2024
26 July 2024
12pm
31 July 2025
31 August 2025
Works
Yes
No
CMP2/1a Greek street carries the two lane Greek Street Roundabout over the five track electrified West Coast Main Line, in Stockport City Centre. Two Tracks run below the East Span with the three remaining tracks below the west span. The bridge was originally a tunnel but was reconstructed as an overbridge in 1958.
The Two span Simply supported superstructure consists of precast post-tensioned prestressed concrete deck beams and in-situ reinforced concrete deck slabs. Gaps between the beams are formed by in-situ reinforced concrete. The intermediate support is provided by a reinforced concrete crosshead beam, columns and foundation slab. The deck beams are post-tensioned transversely.
Parapets for the structure are comprised of brickwork.
The bridge has a skew spans of 9.14m on the east and 13.99m on the west side, at angles of 13 degrees.
The carriageway width varies from 9 to 13m due to the layout of the roundabout. Footways are provided adjacent to the north and south parapets of the structure, with varying widths. Trief Kerbing with a mounted pedestrian guardrail are present to separate pedestrians from the carriageway.
Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate.
The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks.
The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-inforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Supply all associated concrete. Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete.
Links
Additional text
Relevant due diligence checks will be carried out.
Construction Line
RISQS
SSIP
Financial Checks
Follow the instructions given in the description or the more information section.
Louise Day
Hiview House, Highgate Road
London
NW51TN
UK
07849630497
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
NCIL Morden Rec Footpath - Access, Leisure and Health下一篇:
Quotation for a review of the Article 4 Directions relating to Conservation Areas in Hart猜你喜欢