Published date: 27 February 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Painting and glazing work - 45440000
Painting work - 45442100
Painting work of buildings - 45442110
Painting and protective-coating work of structures - 45442120
Painting work of structures - 45442121
Refurbishment work - 45453100
Scotland
£100,000 to £500,000
BIP845538818
27 February 2024
12 April 2024
2pm
10 July 2024
29 October 2024
Works
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Yes
Yes
Pladda Lighthouse is situated on the pear-shaped Island of Pladda half a mile off the South East corner of Arran at Latitude 55o 25.5' N, Longitude 05o 07.3' W. The current light, which was automated in 1990, stands 29 meters high and is situated 40 metres above sea level. The light has a white flashing character (3) every 30 seconds giving a nautical range of 17 miles. The only property the NLB currently own on the Island is the lighthouse tower, the smaller tower below, the link corridor building between both towers, and the solar panel structure. All remaining buildings and land are privately owned. Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Tender & Helicopter. Main Items of work: The main items of project work are as listed below:-
1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts' guide for sampling, analysis and clearance procedures" and HSG264, Asbestos: The survey guide.
2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary before use. The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes.
3.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging
4.Land plant/materials/camp on site and establish site.
5.Full redecoration of the station
Suppliers must attend a site visit WC 25 March 2024 to participate in this tender exercise.
Key dates:
10/7/2024 - Contractor to deliver all plant/materials to NLB Oban for loading aboard the NLV Pharos - all loads to be prepared as per NLB Helicopter underslinging guidance
24/7/2024 - NLB Ship and Helicopter will deliver all plant/materials to site - contractor must be on site to receive loads. NLV Pharos will be available to provide accommodation while site camp is constructed
29/10/2024 - NLB Ship and Helicopter will clear site and return all contractor's plant/materials to NLB Oban for collection - all loads to be prepared and weighed as per NLB Helicopter underslinging guidance with dangerous goods signed off accordingly
Links
Additional text
The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Follow the instructions given in the description or the more information section.
Graham Allan
84 George Street
Edinburgh
EH2 3DA
UK
01314733130
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
DSIT 002 - HSE RFQ - VACUUM INSULATED EQUIPMENT COMPATIBLE WITH LH2下一篇:
Services de gardiennage, de sécurité et protection des personnes et des biens pour le Tripostal, la Gare Saint-Sauveur et d'autres lieux de la métropole lilloise du 10 mai 2024 au 10 novembre 2025猜你喜欢