Brook Theatre - Refurbishment and alteration works

2024-07-05

中文

英语 (English)

所属地区: --

所属机构: --

抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 5 July 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 23 August 2024, 12pm

Contract summary

Industry

  • Construction work - 45000000

  • Location of contract

    England

    Value of contract

    £18,500,000

    Procurement reference

    MEDWAY001-DN731419-08961824

    Published date

    5 July 2024

    Closing date

    23 August 2024

    Closing time

    12pm

    Contract start date

    6 January 2025

    Contract end date

    2 October 2026

    Contract type

    Works

    Procedure type

    Open procedure (above threshold)

    What is an open procedure (above threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements above the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    The Brook Theatre is a well-used community resource as well as an important local venue for professional touring productions, but as a result the building is looking tired and quite dated in its internal presentation, so a key element of this project is to improve the general presentation of the interior.

    There are many limitations presented by the building which restrict the way that the building can be used but also impact on the overall visitor experience. This is primarily in connection with the front of house spaces including limited gathering spaces in the café and bar, toilets, and accessibility.

    Key aims for the project include:
    • Increase the available front of house space
    • Front of house spaces to be more open and fluid
    • Create a café with street frontage which would be a destination in itself as well as a co-working space
    • Provide opportunities / space to be able to support emerging / developmental companies
    • Deal with some of the acoustic limitations of the building which are mainly generated by the audience, especially front of house
    • Introduce a digital overlay - infrastructure to use digital backdrops, projection etc in productions
    • Consider the impact of the chandeliers in the Main Theatre and if they could be removed since they restrict performances including projection and lighting
    • Consider how to introduce more flexible stage lighting infrastructure (such as a grid) within the context of the historic interior
    • Provide storage for the auditorium (which could be in the basement if a lift can be extended there)
    • Consider improving the access to the stage for performers who are wheelchair users
    • Providing air conditioning to the main theatre auditorium
    • Reconfiguring the fire exit from the 2nd floor dressing rooms
    • Reviewing the fire compartmentation between back stage and auditorium
    • Reviewing the use of the storage areas in the basement and the impact on the fire strategy
    • Complete refurbishment of all dance and drama studios on the ground and basement floors


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Michael Kelly

    Address

    Medway Council
    Gun Wharf, Dock Road
    Chatham
    ME4 4TR
    United Kingdom

    Telephone

    +44 1634332284

    Email

    michael.kelly@medway.gov.uk

    Website

    http://www.medway.gov.uk/


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Brook Theatre - Refurbishment and alteration works