Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge

2024-09-02

中文

英语 (English)

所属地区: --

所属机构: --

抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 2 September 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 24 September 2024, 12pm

Contract summary

Industry

  • Footbridge construction work - 45221113

  • Location of contract

    SK17 8TD

    Value of contract

    £20,000

    Procurement reference

    PM03511/CDFB/2024

    Published date

    2 September 2024

    Closing date

    24 September 2024

    Closing time

    12pm

    Contract start date

    31 October 2024

    Contract end date

    30 November 2024

    Contract type

    Works

    Procedure type

    Open procedure (below threshold)

    What is an open procedure (below threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements below the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    Cheedale footbridge is a timber beam bridge spanning the River Wye, the bridge sits below the Cheedale Viaduct just off the Monsal trail. Access to the bridge is via the Monsal trail down the steep embankment (footpath) towards the River Wye. The Timber footbridge spans the river sitting on a stone built abutment either side which is in need of some repair works. The bridge is currently shut off for use as it is deemed unsafe.

    The Authority wishes to replace the existing timber footbridge, Cheedale Bridge, just off the Monsal trail.

    Proposed Bridge works to include:
    • Removal of the existing footbridge
    • Replace damaged, defected and missing stonework to the abutments, steps and plinths.
    • Rake out defective and missing mortar joints to the abutments, steps and plinths and repoint.
    • Install a new footbridge similar to existing with an anti-slip deck and fully compliant with current legislation. Note: The contractor is to complete all load calculations as recommended by the British Standards to ensure the existing plinth can take the new load of the bridge.
    • Install new handrail and fencing where necessary to ensure the footbridge, steps and surrounding embankment on the approach to the bridge is compliant exceeding the minimum standards set by the British Standard Institute.


    A full tender pack including details of the scope and location of the works alongside a specification of works can be obtained once an expression of interest is received by emailing catherine.johnson@peakdistrict.gov.uk and requesting the tender pack reference 'Chee Dale Foot Bridge'.


    More information

    Links

  • https://www.peakdistrict.gov.uk/looking-after/about-us/open-government/tenders
  • Tender notice
  • A full tender pack including details of the scope and location of the works alongside a specification of works can be obtained once an expression of interest is received by emailing catherine.johnson@peakdistrict.gov.uk and requesting the tender pack reference 'Chee Dale Foot Bridge'.

  • How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Matt Freestone

    Address

    Aldern House, Baslow Road
    BAKEWELL
    DE451AE
    England

    Email

    matt.freestone@peakdistrict.gov.uk


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Supply and install a footbridge across the River Wye close to Millers Dale - Chee Dale Footbridge