Published date: 24 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Water-treatment work - 45232430
North East, North West, South West
£500,000
CA18/2/1/95
24 September 2024
29 October 2024
5pm
2 January 2025
31 March 2026
Service contract
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
In 2011, the Water and Abandoned Metal Mines (WAMM) Programme was set up between the Environment Agency, Defra and the Coal Authority to address pollution of rivers by abandoned metal mines.
Currently, the Coal Authority operates four WAMM mine water treatment schemes, each using a different treatment technology,
which are improving water quality in about 20 km of rivers.
In January 2023, Parliament adopted a statutory metal mines target, under the Environment Act 2021, to halve the length of English rivers polluted by harmful metals from abandoned metal mines by 2038.
The Government's Environmental Improvement Plan (EIP), published in January 2023, estimated that to achieve this long-term target would likely require around 40 new mine water treatment schemes and a similar number of diffuse interventions.
The EIP set a non-statutory interim target to construct 8 mine water treatment schemes and 20 diffuse interventions by 31 January 2028.
To help deliver the interim and long-term targets, the WAMM Programme is currently investigating active treatment options for mine water discharging from abandoned metal mines by undertaking active treatment trials on up to five sites
This opportunity is now open with a submission deadline of 29 October 2024
All interested parties are advised to visit each site to familiarise themselves with the sites layout, limitations, restrictions and access.
Visits to the premises must be made by appointment only with the Coal Authority
.
There is limited parking at each site, interested parties shall only attend at the agreed time provided by the Client.
Wheal Jane, TR3 6EE: 15th October 2024
Bridford, Nr EX6 7AR: 16th October 2024
Cambokeels, Nr DL13 2HW: 1st October 2024
Killhope, DL13 1AR: 30th September 2024
Nent Haggs, CA9 3LE: 3rd October 2024
PPE required:
• High viz vest
• High viz trousers
• Safety Boots
• Eye protection
• Gloves
• Hard hat
Should you wish to attend any , or all of the sites please contact peterkobryn@coal.gov.uk who will confirm arrangements
Full and free access to all tender documents is available through the Coal Authority portal InBye
Active Treatment Trials - innovative technology and approaches
Attachments
Additional text
The appointed party / parties will design and undertake pilot trials for the active treatment of mine water of up to 5 no. sites to obtain data for optimised treatment process and costs for treating the mine water at full-scale.
The Coal Authority is looking to award a number of packages of work through this tender ranging from 1 no. of the active trials up to 5 no. active trails. These may be at any of the 5 identified sites.
The Coal Authority reserves the right to award to multiple parties depending on the proposals provided during the tender period. Tenders shall be scored on the basis of most advantageous economic tender against criteria to be published in the tender documents.
The appointed party / parties shall design and supply a suitable pilot scale active treatment plant for each of the mine water sources to be treated.
The appointed party / parties shall provide an individual report at the end of each trial detailing the outcomes.
Follow the instructions given in the description or the more information section.
Peter Kobryn
200 Lichfield Lane
MANSFIELD
NG184RG
England
07826 874541
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Building Materials- East下一篇:
ISO 11 Incinerator Life Extension Project - WP6 Diesel Tank Replacement猜你喜欢