所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 9 October 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Windows, doors and related items - 44221000
Doors - 44221200
Fire doors - 44221220
Installation of doors and windows and related components - 45421100
Installation of doors and windows - 45421130
Installation of doors - 45421131
Installation of metal joinery except doors and windows - 45421140
London
£2,500,000 to £5,000,000
C4N85874442
9 October 2024
15 October 2024
12pm
31 January 2026
30 July 2028
Works
No
No
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of 100+ external door sets to numerous satellite buildings around the station complex. Those buildings include the following:
• South Portal
• West Core
• East Core
• Train Crew and Catering Building
• North Portal
• Cycle Hub
• Various smaller vent structures
• DNO interface substation
The package includes a large number of external doors sets and will include a range of different specification and performance criteria such as:
- single, 1.5 and double door sets
- Oversized plant access doors
- Louvred doors
- External envelope doors with Integrated cladding to external face
- Mild steel and Stainless-steel door sets and frames with varied coatings to resist corrosion.
- Vision panels
- Installed to various substrates
- Fire rated doors (Various levels)
- Security rated doors (Various levels)
- Acoustic Rated doors (various levels)
- Weather rated (various levels)
- Integration with the BMS (building management system)
- Doors and hardware that cater for ultimate differential pressure loading
- Provision of all associated hardware, suitable for use in public areas and sub surface
- and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks.
The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing, manufacture and installation of all External doors sets.
The Subsubcontractor will be responsible for progressing the door schedule and associated Stage 4 drawings to be designed for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The production of mock ups and samples as required for acceptance.
The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the doors. The works will also require multiple visits throughout the contract duration from design stage to completion.
Quantity of door sets - circa 90+.
Expected Subsubcontract award Jan 25
Construction is to be carried out over a 2.5 year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Links
Follow the instructions given in the description or the more information section.
Clare Llewellyn
McDermott House, South Crescent
London
E164TL
UK
07933529243
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢