Published date: 22 April 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
England
£230,000
CLTD001-DN720474-56065794
22 April 2024
10 May 2024
2pm
24 June 2024
31 July 2024
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Corserv Solutions Limited (CSL) CORMAC Solutions division are contracted to Cornwall Council (CC) for the above-named works which have now gained full Planning Permission, have had a detailed design completed and works underway.
Bidders are invited to tender for the subcontract works package, based on
the enclosed information and Bill of Quantities. All correspondence, communication and bid submission must be made through Pro-contract.
Should your bid be successful you will be required to enter into a subcontract agreement based on an NEC3 Short Subcontract (ECC SSC) - remeasurable.
The subcontract will incorporate the documentation contained in this enquiry, your bid information and any subsequent clarifications or agreed amendments prior to entering into subcontract.
*Scope of Works (please utilise additional sheets if necessary):
CT2100036 Truro Northern Access Road (NAR), Cornwall
1100.20 Kerbing - Main Alignment (Labour and Plant only)
Phase 1 - 6,120 m kerbs and edging - starting 26 June 2024 duration 16 weeks
Phase 2 - 11,900 m kerbs and edging - starting 27 January 2025 duration 8 weeks
Cormac will:
• Supply concrete and palletised kerb material free issue to the Subcontractor.
• Manage materials delivery, offloading and protection before delivery to the laydown areas.
• Manage setting out the back of kerb and top of kerb with 10m pins on straight runs and 5m pins on radius sections.
• Provide a minimum of 170 m standard kerb or equivalent per day.
• Provide at least 24 hours' notice if a gang is to be cancelled.
The Subcontractor will:
• The Subcontractor shall be responsible for management of materials after offloading to laydown areas.
• The Subcontractor shall be responsible for distribution of materials from the laydown areas which will be located no further than 200 m from the work face.
• The Subcontractor shall supply all labour, plant, and equipment (including vacuum laying equipment) and fuel required to complete the Subcontract works to suit the Contractor's programme.
The intention is to award the contract to the most economically advantageous tenderer based on 100% Price.
To access the online question template and supporting documents, express an interest and then click the "start my response" button
Follow the instructions given in the description or the more information section.
Gemma Parker
Western Group Centre
Radnor Rd
Scorrier
TR16 5EH
United Kingdom
+44 1872324560
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
2024_Well-being - UK Occupational Health (OH) and Pre-Placement Questionnaire (PPQ) services for the British Council下一篇:
Cambridgeshire County Council SEND Provider Forum 30th April 2024猜你喜欢