所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 1 April 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Asbestos-removal work - 45262660
South East
£1
Lower Thames Crossing - Kent Roads - Asbestos Removal
1 April 2025
8 April 2025
5pm
5 May 2025
29 August 2026
Works
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
The Lower Thames Crossing (LTC) is a significant infrastructure project designed to address congestion and pollution at the Dartford Crossing, the only road crossing of the River Thames east of London. The project includes the construction of twin-bore tunnels and a dual carriageway linking the M25 at Junctions 28 and 30 to the A2, east of Gravesend.
An Asbestos Removal Contractor is required for the Lower Thames Crossing - Kent Roads. These works are likely to be required from Autumn 2025 following survey and ground investigation works.
The work consists of the following elements:
• Identification, safe removal and disposal of asbestos containing materials in accordance with HSE regulations.
Contractors must have a licence from HSE for removal and disposal of asbestos and carry ISO 9001 certification.
The operatives involved in the works shall be Competent with relevant qualifications and competency cards (Lantra/CSCS) and have a Highway Passport.
Attachments
Additional text
Please complete the attached expression of interest form and return to eleanor.clarke@skanska.co.uk
Follow the instructions given in the description or the more information section.
Eleanor Clarke
1 Hercules way
WATFORD
WD39SW
England
07823 356520
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
BBV Sublot 4 - HSST1020 - Architectural Lighting System下一篇:
งานติดตั้งระบบTransformerOnlineMonitoringรฟ.พลังความร้อนร่วมพระนครเหนือชุดที่1猜你喜欢