Published date: 13 December 2024
Open future opportunity - This means that the buyer is not yet ready to invite bid applications but early notification has been provided and some dialogue may be possible.
Fireproofing work - 45343100
South West
£1,918,127
tender_477419/1435326
13 December 2024
8 June 2025
3 June 2026
15 February 2030
No
No
Work packages for the construction delivery services at Imjin Barracks for the Defence Estate Optimisation Portfolio. Lendlease are delivering works at Imjin Barracks on behalf of the Defence Infrastructure Organisation involving the reconfiguration and refurbishment of existing infrastructure and construction of new infrastructure to provide the MOD with improved Live/Work/Train requirements.
High-level Scope of works:
The Subcontractor is to provide and maintain temporary fire stopping to partitions to ensure compliance with the project fire risk assessment.
Fire stopping to all service penetrations, this includes but is not limited to:
Ductwork, Soil and Vent Pipes, Electrical containment trays & cables, Comms Cabling, Water pipes, Sprinkler pipes, All associated system dampers, Plantrooms, Substations.
Fire stopping to complete and maintain internal fire compartmentalisation.
Additional text
Minimum Compliance Requirements
Lendlease Financial Performance and Accreditation requirements, Lendlease Global Minimum Requirements, Building Information Modelling requirements, BPSS
Follow the instructions given in the description or the more information section.
Lendlease, Orega, The Colmore Building, 20 Colmore Circus Queensway,
Birmingham
B4 6AT
England
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Supply of Handheld Mobile (Radio Frequency) Detectors下一篇:
Supply Chain Notice: WC1143143 - AKI- CIDP Tool Ref: 1031980- (AK0128) - RAF AKROTIRI - RECLADDING AND STRUCTURE STRENGTHENING WORKS猜你喜欢