所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 24 June 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Electrical installation work - 45310000
Electrical wiring and fitting work - 45311000
Electrical wiring work - 45311100
Electrical fitting work - 45311200
Electrical installation work of heating and other electrical building-equipment - 45315000
Electrical engineering installation works - 45315100
Other electrical installation work - 45317000
Electrical installation work of transformers - 45317200
Electrical installation work of electrical distribution apparatus - 45317300
Electrical installation work of filtration equipment - 45317400
Mechanical installations - 45350000
Mechanical engineering installation works - 45351000
Electrical-system repair services - 50116100
Repair and maintenance services of electrical machinery, apparatus and associated equipment - 50532000
Repair and maintenance services of electrical and mechanical building installations - 50710000
Repair and maintenance services of electrical building installations - 50711000
Repair and maintenance services of mechanical building installations - 50712000
Installation services of electrical and mechanical equipment - 51100000
Installation services of electrical equipment - 51110000
Installation services of mechanical equipment - 51120000
Electrical services - 71314100
Engineering design services for mechanical and electrical installations for buildings - 71321000
Electrical power systems design services - 71323100
Mechanical engineering services - 71333000
Mechanical and electrical engineering services - 71334000
West Midlands, East Midlands, South East
£250,000 to £500,000
C4N81727249
24 June 2024
5 July 2024
7pm
25 October 2024
28 March 2025
Works
No
No
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent contractor to provide the mechanical cooling system.
Duty sharing, cooling-only, and low wall-mounted indoor units are to be supplied for the MNO Comms room and HS2 Comms room A & B, while high wall-mounted indoor units are designated for Battery Room A & B. Each indoor unit must come equipped with complete mounting brackets and necessary accessories for installation within the designated rooms, along with condensate pipes and relevant fittings.
Every indoor unit must be accompanied by a wall-mounted controller to regulate its operation within the respective room. The controller should feature a digital display that presents key operational functions of the indoor units, such as room temperature, setpoint temperature, programmable schedules, and other relevant information.
Links
Follow the instructions given in the description or the more information section.
Chris Read
Floor 5, 19 Cornwall Street
Birmingham
B3 2DT
UK
07792825436
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Water Hygiene Contract - Market engagement下一篇:
EKFB JV - Mechanical Electrical Works for Green Tunnel Portal Building Electrical Heating System Package猜你喜欢