所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 5 November 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Bridge - 44212100
Construction work for bridges - 45221100
Bridge construction work - 45221110
North East, North West
£400,000
A57 Temporary Bridge
5 November 2024
22 November 2024
10am
4 March 2025
4 March 2027
Works
Competitive procedure with negotiation (above threshold)
Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
- To write and take ownership of the AIP process in line with CG300 and work with National Highways until sign off of the AIP whilst co-ordinating with the Balfour Beatty Temporary works Team.
- To supply and install the temporary bridge.
- To be installed on bank seats placed on reinforced earth abutments
- 55m estimated span
- 11m Estimated width
- Loading - Suitable for 40t Articulated dump trucks for movement of mass haul material across the existing A57
- See attached preliminary outline drawings
Installation by Others:
- Installation of concrete bankseat
- Installation of reinforced earth abutment
Additional text
Note: This is only an expression of interest for the time being, ITT documents will not be posted via contracts finder
Follow the instructions given in the description or the more information section.
5 Churchill Pl
London
E145HU
England
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
ประกาศจัดซื้อจัดจ้างกิจกรรม Back to School ปี 2 จ.แพร่ วันที่ 8 พ.ค 2567下一篇:
Heating Systems Inspection, Service, Repair and Replacement猜你喜欢