Priory Building Lift Upgrade
11 July 2024
16 September 2024
12pm
30 September 2024
31 October 2024
Works
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
The Priory is a listed building. We have a small passenger and goods lift capacity for 6 persons and a maximum load of 450 kg that is used from the ground floor to get to the first floor. We also have a motor room to the side of the lift. The lift is all most 30 years old and is in need of complete upgrade. All tenders will need to do a complete site survey to be arranged with the maintenance manager before putting in a tender. Tender to come with maintenance contract costs.
Access and possible restrictions in the delivery phase of the project. Access to the priory is from 8 to 5 every week day. Weekend work can be arranged with maintenance manager if there is no events on.
Progress reporting The council will require reporting as required and in particular any impact on the project timescale, plus anything that may cause reputational damage to the council.
Payment terms Please specify in the pricing schedule the requirement for any phased payments. WTC seek to pay all correct invoices within 30days.
Retention value / period WTC will retain 0% of the contract value for a period of X months.
Penalty clauses Clause to be inserted as required.
Conditions of contract The Council require assurances from all potential contractors through the provision of appropriate documentation that:
• All operatives are suitably trained and qualified to use any machinery involved in the work.
• Operatives will at all times wear suitable protective clothing and high viz jackets.
• Safety and advisory signage will be required as necessary
• Contractors will be required to supply details of public liability insurance with the tender papers.
• Contractors will be required to undertake a COSHH assessment for all chemicals used during the delivery of the contract.
• Contractors will be expected to provide a method statement detailing how the various elements of the work will be undertaken.
• Project timescales will be provided where applicable.
Access and possible restrictions in the delivery phase of the project. Access to the priory is from 8 to 5 every week day. Weekend work can be arranged with maintenance manager if there is no events on.
Progress reporting The council will require reporting as required and in particular any impact on the project timescale, plus anything that may cause reputational damage to the council.
Payment terms Please specify in the pricing schedule the requirement for any phased payments. WTC seek to pay all correct invoices within 30days.
Retention value / period WTC will retain 0% of the contract value for a period of X months.
Penalty clauses Clause to be inserted as required.
Conditions of contract The Council require assurances from all potential contractors through the provision of appropriate documentation that:
• All operatives are suitably trained and qualified to use any machinery involved in the work.
• Operatives will at all times wear suitable protective clothing and high viz jackets.
Follow the instructions given in the description or the more information section.
SEAN HIGGINS
The Priory,High Street
WARE
SG129AL
England
01920460316
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
L24041-T-LH Pier B, PRM Fit Out Retender下一篇:
Tender for Supply and Installation of Air to Air Heat Pumps at Armada Court for Hinckley and Bosworth Council猜你喜欢