Published date: 31 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction materials and associated items - 44100000
Structural products - 44200000
Miscellaneous fabricated products and related items - 44400000
Tools, locks, keys, hinges, fasteners, chain and springs - 44500000
Paints, varnishes and mastics - 44800000
Site preparation work - 45100000
Miscellaneous repair and maintenance services - 50800000
Sporting services - 92600000
PE9 2PY
£30,000
STG/EYFS/2025
31 January 2025
14 February 2025
5pm
20 July 2025
31 August 2025
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
Yes
1 Introduction
1.1 Company Background
St Gilbert's Church of England Primary School (known as 'the School') is a standalone primary academy. Academy status was granted in January 2013.
Located to the West of the historic town centre of Stamford, the school currently has 300 pupils form 4 - 11 years of age.
The current school buildings were established in the early 1970's with a further addition at the beginning of the 2000's.
'The School' is currently rated 'Good' by OFSTED
1.2 Project Background
The existing outdoor play area was installed circa 2008/9 and included:
• Wet pour safe play surface throughout
• Outdoor secure storage for resources
• Activity areas and play equipment
The equipment is now at the end of its economic life and 'the School' are looking to redesign the existing area with a space that is inviting and inspirational for the pupils in the Reception phase of the school
1.3 High Level Overview of Requirements
Bidders are asked to submit a formal tender for the redevelopment of the Early Years outdoor play area
.
1.4 Existing Provision
The existing provision has the following equipment installed:
• Wooden picket boundary fencing
• Wet pour safe play surface throughout
• Central climbing frame and slide
• Sand pit
• Mud pit with activity panels
• Secure storage for outdoor resources
• Raised bed planter
• Covered activity area
See appendix 1 for photographs of the existing provision
To create and inviting and inspirational outdoor play area for use by pupils in the Early Years (Reception) phase.
Key requirements are:
• Removal/recycling of existing facilities including surfacing and timber structures
• Ensuring compliant foundations for any new surfacing or structures
• Design service to be completed in collaboration with 'the School'
• Provision of equipment that will aid the physical development of all pupils
• Provision of equipment that will encourage the joy of learning
• Provision of equipment that enables creativity in play
• Creative design that will enhance the natural world
• A safe play surface and equipment compliant with BSEN1176 and BSEN1177
• Where possible, as much of the materials to be used are from recycled or sustainable sources
• Provision of a full maintenance schedule
• Use of qualified/registered installers
• All contractors to be DBS checked
Attachments
Follow the instructions given in the description or the more information section.
Peter Allan
Foundry Road
STAMFORD
PE92PY
England
01780762400