Published date: 14 February 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Communications control system - 32573000
Command, control, communication and computer systems - 35710000
Command, control, communication systems - 35711000
Tactical command, control and communication systems - 35712000
Command and control system - 42961000
Computer control system - 48151000
North West
£7,600,000
CF-0213800D4L000000iAvzUAE
14 February 2025
25 April 2025
4pm
12 September 2025
12 September 2028
Supply contract
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
The Waste Packaging and Encapsulation Plant (WPEP) is a two-line process plant designed for encapsulating Flocculant (FLOC) arisings from the Enhanced Actinide Removal Plant (EARP) process, waste from the Segregated Effluent Treatment Plant (SETP) and the Effluent Plant Maintenance Facility (EPMF). The waste is encapsulated in stainless steel drums within a cement mix. Filled drums are lidded, and then monitored before being stored, initially in the WPEP Store, before being exported for longer term storage in the Encapsulated Product Stores.
The aim of the project is to replace the existing WPEP Distributed Control System (DCS) with a replacement control system based on modern technologies, whilst applying relevant Sellafield standards, guides and procedures.
The project aims to:
• Replace the existing DCS hardware, system software and configuration with a modern control system ensuring that the plant continues to function in the same manner
• Incorporate the currently independent Drum Decontamination and Powders PLC functionality to the replacement WPEP control system
The operability of the replacement control system is to align, as closely as possible, to the existing control system to reduce the impact on operator training and the changeover between the two systems.
• The replacement control system will be installed such that the existing control system remains in situ, providing a fall-back in the event of delays or commissioning issues. However, given space constraints, it may not be possible to do this in all instances and some existing equipment may be removed prior to installing elements of the replacement control system.
Please note the duration of the contract is an estimate which will be finalised upon Contract Award.
Parties who are interested in potentially submitting a tender for this opportunity are requested to register on the shared service Nuclear Decommissioning Authority (NDA) OneNDA eCommercial Systems powered by Atamis, which can be accessed via the URL https://atamis-2464.my.site.com/s/Welcome . Parties who register on this system should then register against Atamis Project C13138 in order to access the Waste Packaging & Encapsulation Plant Distributed Control System opportunity in order to:
- view the procurement and tender documents,
- ask questions or request further information using the inbuilt messaging facility; and
- submit your tender response
Follow the instructions given in the description or the more information section.
Richard Dawson
Hinton House, Birchwood Park Avenue
Warrington
WA3 6GR
United Kingdom
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
เช่ารถยนต์ราชการจำนวน14คันของสำนักงานสถิติแห่งชาติประจำปีงบประมาณพ.ศ.2567(ผูกพัน5ปีตั้งแต่ปีงบประมาณพ.ศ.2567ถึงปีงบประมาณพ.ศ.2573)ด้วยวิธีประกวดราคาอิเล็กทรอนิกส์(e-bidding)下一篇:
The Growth Company Limited Essential Work Skills猜你喜欢