Ports of Jersey is currently underway with the development of an Airport Masterplan. This Masterplan includes modernising and optimising the Departures Lounge ('DL') to meet current and future passenger needs in line with our strategic business plans. To support the DL redevelopment, a concept design has been developed for the ground floor of the terminal building.
Ports of Jersey programme wide objectives are:
• Develop areas of the ground floor of the DL, unit size approximately 2000sqm
• Ensure capacity to accommodate passenger growth
• Modernise and replace ageing infrastructure
• Embed sustainability into every aspect of the airport
• Create a coherent sense of place for Jersey Airport.
• Accessibility and inclusivity for passengers with disabilities
Ports of Jersey wish to appoint a principal contractor to undertake all works associated with Phase 1 of the Jersey airport departures lounge redevelopment. The works during Phase 1 will entail enabling works to facilitate the temporary routing of passengers whilst the work for Phases 2 and 3 are undertaken.
Follow the instructions given in the description or the more information section.
Jersey Airport
St Peter
JE1 1BY
United Kingdom
+44 1534446094
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
ประกาศผู้ชนะการเสนอราคา จ้างพัฒนาระบบสารสนเทศเพื่อการให้บริการประชาชน โดยใช้เทคโนโลยีปัญญาประดิษฐ์ (ครั้งที่ ๒) ด้วยวิธีประกวดราคาอิเล็กทรอนิกส์ (e-bidding)下一篇:
TOILET UPGRADE PROGRAMME猜你喜欢