所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 11 February 2025
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Construction work - 45000000
West Midlands
CRML0001 - Expression of interest - Herefordshire A4113 Leintwardine
11 February 2025
18 February 2025
Yes
No
Background - Balfour Beatty Living Places on behalf of their client Herefordshire Council
The River Teme rises in mid-wales before it crosses the border into Herefordshire close to the village of Leintwardine and then continues its course down to Ludlow in Shropshire and beyond before joining the River Severn just south of Worcester. It is designated in its entirety as a SSSI and the soils are mostly freely draining gravelly flood plains.
Over recent years and continued flood events the course of the River Teme has evolved dramatically, particularly at the subject area of Leintwardine. There is significant erosion occurring to the embankments which need to worked upon to ensure this does not start causing an impact on the carriageway.
Drawings provided are pre-liminary drawings at this stage for EOI only. Final drawings will be released with the RFQ in due course.
If interested, please contact Elisabeth Wyllie: elisabeth.wyllie@balfourbeatty.com
Attachments
Follow the instructions given in the description or the more information section.
Elisabeth Wyllie
5 Churchill Place
LONDON
RG238BG
England
07922 100358
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢