所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 13 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Architectural, construction, engineering and inspection services - 71000000
London
£250,000
BIP916758363
13 January 2025
7 February 2025
12pm
1 May 2025
31 March 2026
Service contract
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
No
Yes
Last financial year, a large proportion of Tate Modern's Curatorial budget was spent on alternations of the gallery spaces, mainly dismantling and re-building walls, to suit the layout requirements for each exhibition. This practise also contributes to one of the largest portions of the carbon footprint generated by exhibitions production.
Tate Modern would like to turn this challenge into an opportunity, where we are taking advantage of a completely empty space to design a new gallery that could be adapted for multiple exhibition projects in a low cost and circular way.
This project will commission specialised designers to design a set of modular, movable and re-configurable walls to use in Blavatnik L2 South Gallery. This would allow us to respond to project-specific spatial needs by achieving multiple layouts with flexible setworks, making substantial efficiencies in construction costs, materials, labour and waste.
Links
Follow the instructions given in the description or the more information section.
Declan McAlister
Tate
Millbank
London
SW1P 4RG
UK
+442078878811
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
The Steadings - Drainage Masterplan - Award Decision.下一篇:
Travaux de rénovation du centre Afpa d'Issoudun猜你喜欢