Published date: 11 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Survey services - 79311000
NR33 0HT
£80,000 to £100,000
CF-0422500D8d000003VQwdEAG
11 December 2024
9 January 2025
12pm
24 January 2025
31 December 2025
Service contract
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Background:
The BEEMS (British Energy Estuarine and Marine Studies) programme is funded by Sizewell C Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require the Supplier to deliver the elements described below.
Requirement:
The purpose of this project is to provide bathymetric data for the Greater Sizewell Bay (GSB) to assess the geomorphological changes of the region, hence contributing to the ongoing monitoring of the Sizewell Coastline.
Cefas require two Multibeam Echosounder (MBES) bathymetric surveys to IHO Special Order (at a minimum) within the Greater Sizewell Bay (GSB) in 2025. Exact survey locations will be agreed between Cefas and the supplier during the pre-survey kick off meetings.
Survey 1 will be in April 2025 and will require nearshore transects to be undertaken to assess the geomorphological changes shown by two longshore bars. Therefore, care should be taken to maximise landward extent, and the survey should be undertaken during a Spring tide window to extend the coverage in the landward sense as far as practicable. Three further East to West Corridors ('Radar Calibration Corridors') are included in the scope for Multibeam survey (Figure 1).
For areas of survey overlap between nearshore or calibration corridors, the expectation is that coverage shall only be acquired once, and hence supplier's should provide details of a proposed survey plan to meet this requirement and ensure that there are no gaps in coverage.
Survey 2 would be undertaken in July 2025. The final area to be surveyed will be confirmed by Cefas in spring 2025, but will broadly cover the area between the two lines in Figure 2. The expected maximum survey extent would be 2 km2 but this may be reduced once areas of interest are identified, so therefore expected that this survey to be costed per day. This survey is likely to be required on spring tides to enable any shallow water areas to be accessed.
Survey Strategy:
Cefas aim to confirm the finalised survey areas in a kick-off meeting with the supplier prior to each of the surveys. The supplier should note that the survey due to occur in April 2025 will be required on Spring Tides. The supplier should provide a line plan two weeks prior to the survey for Cefas to review and provide comment. The regular system of sounding lines shall be supplemented by a series of crosslines for verifying and evaluating the accuracy and reliability of surveyed depths and plotted locations in April. In July, a survey plan and/or dynamic line plans will be required but can be provided nearer the time of survey. The spacing between crosslines should typically be no more than 15 times that of the main sounding lines.
For full details Download the Bidder Pack at https://defra-family.force.com/s/Welcome and search for CEFAS24-145 under opportunities.
Follow the instructions given in the description or the more information section.
Laura Anderson
Pakefield Road
Lowestoft
NR33 0HT
GB
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
上一篇:
Framework for a Mid-Tech Homecare Service下一篇:
Projet de rénovation et extension de la salle omnisports猜你喜欢