所属地区: --
所属机构: --
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。
Published date: 5 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Roadworks - 45233140
Road-maintenance works - 45233141
Road-repair works - 45233142
England
£80,000 to £200,000
BLACKDARW001-DN754920-53326703
5 December 2024
13 January 2025
12pm
1 April 2025
31 March 2027
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Blackburn with Darwen Borough Council looks after a large range of highways and non-highway areas in various stages of repair and maintenance. Blackburn with Darwen has a unique environment and economy, which presents specific challenges to delivery of surfacing and civils schemes.
In addition, a significant investment programme in the town is leading to increased demand for new highways, changes to layouts and modern surface finishes.
The council has In house operational teams that carry out or supervise a variety of highway maintenance works across the borough. Maintaining the safety of the public and the Council's staff is a key consideration in delivering these works. Often these works require no provision of thermoplastic road markings. However, some of the works require replacement/renewal/removal of thermoplastic road markings that require equipment not held by the Council. In these circumstances, external contractors are procured to carry out these works.
Some of this work will be regular, planned, routine and other work will be part of larger schemes.
Works should normally be carried out within 10 working days of receipt of the instruction from the council's Clients Representative, or his authorised officer.
However, there will be a requirement to provide thermoplastic road markings within a reduced timescale.
The majority of the work required will take place on highway authority roads with speed limits up to 50mph; however contractors shall be competent to work on high speed roads up to 70mph when required.
Follow the instructions given in the description or the more information section.
Luke Smith
Floor 4 The Town Hall
King William Street
Blackburn
BB1 7DY
England
Is there anything wrong with this page?
本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢