Contract summary

Industry

  • Operation of electrical installations - 65320000

  • Location of contract

    PO1 2AL

    Value of contract

    £2,550,000 to £4,400,000

    Procurement reference

    IT-26-5024-P00005024

    Published date

    5 October 2024

    Closing date

    4 November 2024

    Closing time

    2pm

    Contract start date

    6 January 2025

    Contract end date

    31 March 2028

    Contract type

    Service contract

    Procedure type

    Open procedure (above threshold)

    What is an open procedure (above threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements above the relevant contract value threshold.

    Contract is suitable for SMEs?

    No

    Contract is suitable for VCSEs?

    No


    Description

    Portsmouth City Council ('the Council') is inviting tenders from suitably qualified and experienced operators for the management of day-to-day operations of the shore power system currently under installation at Portsmouth International Port ('PIP'). The system is targeted to enter operation on 1st April 2025 following testing and commissioning in early 2025.

    OPERATIONAL REQUIREMENTS SUMMARY

    The Council requires an operator to manage the operations of the shore power connection across the three busiest berths at the port. At present, PIP has several vessels calling daily throughout the year, which is usually between the hours of 05:45-23:59. The Council's operator requirements are set out below in summary, however tenderers must refer to the detailed information set out within the 'Specification' document included within the tender pack accessible via IN-tend. In the event of any discrepancies the detailed information set out within the Specification, other technical documents, contractual terms, etc. take precedent over the summarised information included below.

    The appointed HV contractor will be required to have availability 365 days of the year, with a possible estimated 650 connections during the year, which may increase or decrease dependent on system take up by cruise and ferry customers. Requirements will be demand led and no guarantees can be provided in respect of minimum or maximum numbers of annual connections. The successful operator will be, in summary, required to undertake the following services:

    o Early engagement with the Port and ABB to have an overview of the testing and commissioning of the shore power solution
    o Undertake the following under a Control, Operations, Maintenance Agreement ('COMA') agreement, as a minimum.
    o Commissioning of the vessels for the use of the shore power.
    o Set up connections, carry out the connection and disconnection of vessels to the shore power.
    o Management of the COMA agreement for the system.
    o Identification and reporting of system faults.
    o Operational and system audits.
    o Provision of HV awareness training to relevant Port staff

    The contractor will need to remain on site at all times whenever vessels are connected to the shore power system. The Council will require the contractor to be able to attend site on a dynamic basis as berthing programmes can be subject to change at short notice due to weather conditions and other factors.

    PARTNERSHIP WORKING

    The Council wishes to appoint an operator who can work in partnership during the duration of the contract to review the operations and commercial elements to allow continuous improvement in the service levels to PIP's customers, operational efficiencies, and financial savings.

    As set out within the Specification, the operator will be required to work in collaboration with PIP to:

    o Overcome any identified contract challenges and complications to ensure ...


    More information

    Links

  • https://in-tendhost.co.uk/portsmouthcc/aspx/
  • Additional information on how to apply for this contract
  • Additional text

    Portsmouth City Council is currently in the process of seeking expressions of interest for the following project - Shore Power HV Operations Management - Portsmouth International Port.

    The full details and ability to express an interest will be via our e-sourcing system Intend. This filepath will take you to the relevant area of Intend,

    https://in-tendhost.co.uk/portsmouthcc/aspx/Tenders/Current

    Once on the page you can either scroll down or use the search function to find the relevant project.

    Should you have any problems with the above link, please contact us on 023 9268 8235 or email: procurement@portsmouthcc.gov.uk


    Is a Recurrent Procurement Type? : No


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Richard Lock

    Address

    George Byng Way
    Portsmouth
    Hampshire
    PO1 2AL
    United Kingdom

    Telephone

    1262

    Email

    richard.lock@portsmouthcc.gov.uk


    Share this notice

    Is there anything wrong with this page?

    温馨提示:

    本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
           如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    首页 > 英国 > Shore Power HV Operations Management - Portsmouth International Port