Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Closing: 24 May 2024, 5pm
Contract summary
Industry
Repair and maintenance services - 50000000
Location of contract
PE12 7LW
Value of contract
£25,000
Procurement reference
Damp Proofing May 2024
Published date
30 April 2024
Closing date
24 May 2024
Closing time
5pm
Contract start date
17 June 2024
Contract end date
30 June 2024
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
Coubro Chambers requires works to two areas, one external and one internal.
Park Bungalow is a 3 bedroom detached bungalow and requires full damp proofing.
Coubro Chambers
To fit floor protection sheets as needed taped down throughout works
To remove 1 x radiators and set aside to refit
To remove skirting boards and set aside to refit
To remove internal plaster as plan as needed
To supply & fit external render with sand, cement, lime & water proofing damp agent to the top section of the rendered wall where render missing fitting vertical stop ends. Repair cracks to the existing lower level render. Seal vertical beads / joints / trims to brick work to prevent water ingress
To provide means to remove debris from site
To install Tri gel damp proof course inclusive of 30 year contractors guarantee to areas detailed on the enclosed plan
To treat stated walls for works with salt neutralizer
To form a bottle cove filet at the floor wall junction solid floors
To apply slurry & 2 coat tanking low level from DPC lapped to
To fit Platon damp membrane, board & skim fed into ceiling/ wall, floor wall, wall / plaster junctions, overlapped & sealed with tape. 22mm insulated wall board & skim to finish
To refit existing skirting boards IF SOUND Additional charge for new if rot found
To refit existing radiator, re hang brackets, fill & bleed.
To provide 30 year guarantee
Park Bungalow
22 rooms fitted with artex type wall coating.
Electric radiators
Bathroom and kitchen not to be refitted, quotation included to dispose of said items.
Bathroom and kitchen tiles to remove
Overskim all walls to ceiling.
To fit floor protection sheets as needed taped down throughout works
To remove electrics wall heater radiators - disposal
To remove electrical power points & set aside to refit
To remove kitchen base units, work tops, appliances and set aside to refit - disposal
To remove bathroom fitments a - disposal
To remove skirting boards - disposal
To remove internal plaster as plan 1.2M high
To strip remaining wall paper from 1,2M high to ceiling
To remove wall tiles to kitchen and bathroom
To provide means to remove debris from site
To install Tri gel damp proof course inclusive of 30 year contractors guarantee to areas detailed on the enclosed plan
To treat stated walls for works with salt neutralizer
To form a bottle cove filet at the floor wall junction solid floors
with step in floor level and/or high ground level
To render and skim walls where plaster removed up to 25mm thick. 3:1 sand, cement & added water proof salt inhibitor
To uni bond and overskim walls from 1.2M high to ceiling.
To supply & fit new 4" MDF Chamfered skirting boards. To all rooms excluding bathroom and kitchen. (these rooms are usually fitted with skirting around bathroom fitments and kitchen appliances.
To refit existing electrical power points