Published date: 25 February 2025
Last edited date: 25 February 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Watch this notice
Print this notice
Closing: 28 March 2025, 12pm
Contract summary
Industry
Construction work - 45000000
Location of contract
United Kingdom
Value of contract
£3,200,000
Procurement reference
LANC001-DN752184-65034447
Published date
25 February 2025
Closing date
28 March 2025
Closing time
12pm
Contract start date
13 May 2025
Contract end date
30 January 2026
Contract type
Works
Procedure type
Open procedure (below threshold)
What is an open procedure (below threshold)?
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Phase 1 - Pre-Construction Services (RIBA Stage 4)
The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase.
Key Responsibilities for RIBA Stage 4:
• Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications.
• Assist with detailed cost estimation, including providing open book pricing.
• Contribute to risk management by identifying potential risks and proposing mitigation strategies.
• Review and validate the design to confirm that it aligns with project requirements and is feasible for construction.
Phase 2 - Construction Works (RIBA Stage 5 and 6)
The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor's performance and the project's requirements.
The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works.
The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required.
Key Points for RIBA Stage 5 and 6:
• The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4.
• Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations.
Deliver the goods and or provide services/deliver the works at Williamson Park, Quernmore Road, Lancaster LA1 1UX; The Storey, 2 Meeting House Lane, Town Centre, Lancaster, LA1 1TH; City Lab 406 Dalton Square, Lancaster, LA1 1PP.
The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process.
The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be ex
How to apply
Follow the instructions given in the description or the more information section.
Is there anything wrong with this page?