信息详情

N70 Creamery Cross to Kenneigh Phase 1 and TII HD28 2023

2023-03-30

中文

英语 (English)

所属地区: --

所属机构: --

Short description
N70 Creamery Cross to Kenneigh Phase 1 and TII HD28 2023
Detailed description
Taking on role of PSCS for the entire works Full Traffic Management for each site as per Chapter 8 of Traffic Signs Manual Mechanical Abrasion Removal of bitumen layers by planing to varying depths Excavation of lag defects to depths of 360mm Transport of waste materials to correct licensed facilities Laying of geo-grid for reinforcement and road layers where necessary as per design Relaying surface layers Reinstating existing Road Marking and studs Accommodation Works at entrances

Type of Contract:
Works
Contracting authority
Kerry County Council

County Buildings, Rathass
Co Kerry
Tralee
Ireland

View profile
Contact
Richard Nolan

Response deadline  (Irish time)
17-04-2023 17:00
Currency
EUR
Main CPV code
45233223-8   Carriageway resurfacing works
CPV codes

温馨提示:

本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
       如果您对这篇招标信息有任何补充或修改建议,请告知我们。

猜你喜欢

首页 > 爱尔兰 > N70 Creamery Cross to Kenneigh Phase 1 and TII HD28 2023