信息详情

Cork University Hospital, Wilton - Helipad Facility PAEDS Road Realignment Works Project

2023-05-04

中文

英语 (English)

所属地区: --

所属机构: --

Short description
EST Construction - Cork City -  Cork University Hospital, Wilton - Helipad Facility & PAEDS Road Realignment Works Project
Detailed description
Helipad: (15,197 sqm.) The new helipad will be constructed in the Northeast Staff Carpark on the Hospital site. It will be linked to the Hospital via an enclosed access way/walkway which will include bed lift and stair access. The walkway will connect to the Hospital’s Emergency Department (ED) at first floor level. Modifications will be made to the internal ED corridor to facilitate the safe transfer of patients from the helipad. The construction of the link walkway works will also allow for new parking below the link walkway; the construction of a new stair & lift circulation core with (new) connection to the Emergency Department at ground floor level and associated reconfiguration of areas within this Department. The main Helipad works will consist of the reconfiguration of existing staff car park (including the reduction of car parking spaces from 280-141 spaces) to provide two separate staff parking areas to the east and west of the new helipad, each with separate vehicular access; new Helipad and car park lighting; new external pedestrian stairways; landscaping works including the regrading of car park levels and soft landscaped areas around the helipad; the provision of new planting along the north and east boundaries; the erection of a new pedestrian bridge over the hospital campus ring road linking into new elevated walkway. Paediatric Ground Works (6,000 sqm.) Works to include the construction of a new campus road to divert traffic away from the existing road when complete, alterations and diversion of site services (e.g. ESB, Gas, Water etc.) & utilities, reduced level dig, construction of retaining walls, construction of Service Yard, installation of site services, landscape works, construction of fencing and guarding together with associated external works on a “Live” Hospital campus.

Type of Contract:
Works
Contracting authority
Health Service Executive (HSE)

Head Office
Millennium Park
Naas
Ireland

View profile
Contact
Martina Forde

www.hse.ie
Response deadline  (Irish time)
02-06-2023 13:00
Currency
EUR
Main CPV code
45000000-7   Construction work
CPV codes
45210000-2   Building construction work
45215100-8   Construction work for buildings relating to health
45215140-0   Hospital facilities construction work
45113000-2   Siteworks
45223000-6   Structures construction work
45232451-8   Drainage and surface works
45233140-2   Roadworks
45310000-3   Electrical installation work
45350000-5   Mechanical installations
45313100-5   Lift installation work

温馨提示:

本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
       如果您对这篇招标信息有任何补充或修改建议,请告知我们。

猜你喜欢

首页 > 爱尔兰 > Cork University Hospital, Wilton - Helipad Facility PAEDS Road Realignment Works Project