Short description CHI Island Key -
Remediation of preservative treatment to Timber Cladding for 2 Apartment Blocks at Island Key Apartments, East Wall, Dublin 3 Detailed description The site is located at Island Key Apartments, East Wall, Dublin 3. The Site consists of 6 blocks, only two of which will be considered in this scope, namely, Block 4 and Block 5. Block 4 is divided into the End Block, Middle Block and Tower Block. Block 5 consists of Duplex units within 6 smaller, almost identical, blocks. All units are fully occupied serving mainly as residential units, with a few of the units consisting of businesses.
The project will consist of the treatment of all external timber cladding to Block 4 and Block 5, treatment of windows/doors in the Tower Block and all of the Duplex units, localised repair to damaged cladding boards at Block 4 and Block5.
Type of Contract:
Works | Contracting authority Co-operative Housing Ireland
11/12 Warrington Place D02 E221 Dublin 2 Ireland
View profile | Contact Michael Fleming
www.cooperativehousing.ie |